Power standing charge (término de potencia)
The fixed part of a Spanish electricity bill that you pay for the kW you have contracted, whether you use them or not. It is the contracted power of each period multiplied by its price and by the days billed.
What the término de potencia is
The término de potencia is the fixed part of your electricity bill, the Spanish version of a standing charge (a fixed customer charge in the US), but calculated per kW. You pay an amount for each kW of contracted power (potencia contratada) and for each day of the billing period, even if the home is empty.
How it is calculated
On the 2.0TD tariff there are two power periods: peak (P1) and off-peak (P2). For each one, multiply:
- the contracted kW,
- by the price per kW per day,
- by the days on the bill.
As a rough guide, the fixed cost of power is about 30 euros per kW per year on the 2.0TD, including network charges and the supplier’s margin. Going from 4.6 to 6.9 kW can therefore add about 70 euros a year just for having that power available.
Power charge and energy charge
- Power charge: fixed, depends on the kW contracted.
- Energy charge (término de energía): variable, depends on the kWh you use and when you use them.
Using less lowers the energy charge; adjusting your power lowers the power charge.
How to pay less
- Contract the power you actually use at the same time, not the total of all your appliances.
- The 2.0TD allows a different power in peak and off-peak: if you charge an EV at night, you may only need to raise the off-peak one.
- Use dynamic load balancing for the charger instead of raising your power.
- Check your maximum demand reading (maxímetro) before deciding.
See contracted power and tariff review in Seville, Spain.
Related services
Contracted power and tariff
We carry out a contracted power review in Seville, Spain based on data, not guesswork: we measure your real consumption peaks and adjust the peak and off-peak power of the 2.0TD tariff so you do not pay for potencia contratada (contracted power) you never use, and the limiter does not keep cutting your supply. Ideal before adding an induction hob, air conditioning or an EV charger.
Increase contracted power
You need to increase your electricity power in Spain when the smart meter cuts everything off as soon as the air conditioning, the oven and the washing machine run together. We check what power your installation can take, upgrade the supply cable, main switch and fuse board if needed, and issue the boletín so the distributor approves the increase.
Need an electrician in Seville, Spain?
Call us or send a WhatsApp message with a photo of the job. You get a fixed quote before any work starts.