When do business premises need an electrical project in Spain?
Business premises need an electrical project when ITC-BT-04 requires it, as with premises open to the public and higher power installations; otherwise a technical design report signed by the installer is enough. The project is signed by a qualified technician and costs, as an estimate, 400 to 1,500 euros.
When business premises need an electrical project
Knowing whether you need an electrical project is key before opening a business, because it affects timescales and budget. The rule is in ITC-BT-04 of Spain’s low voltage regulations: depending on the type of installation and its power, the paperwork can be a technical design report (MTD) or a project.
MTD or project: the difference
| Technical design report (MTD) | Electrical project | |
|---|---|---|
| Who signs it | The registered electrical contractor | A qualified technician |
| When it is used | Installations that do not need a project | Those listed in section 3 of ITC-BT-04 |
| Format | Official Junta de Andalucía form | Full technical document |
| Cost | Usually included with the boletín | 400 to 1,500 euros, as an estimate |
Cases that require a project
- Premises open to the public (locales de pública concurrencia): shops, bars, restaurants, academies, clinics or offices that receive the public, also regulated by ITC-BT-28.
- Higher power installations, for example in industrial units.
- EV charging when the total power of the infrastructure exceeds 50 kW.
- Solar above a certain power, generally above 10 kW.
- Other special cases set by the regulation itself.
Premises open to the public also need an initial inspection by an authorised inspection body (OCA) before being energised, and periodic inspections every 5 years after that.
What a project includes
- Calculation of the expected load and cable sizes.
- Single-line diagram and drawings.
- Switchboards, protective devices and discrimination (selectivity).
- Emergency lighting and, where applicable, a standby supply.
- Specifications and budget.
How it fits with the opening licence
The electrical paperwork (boletín, technical report or project, and the initial inspection where applicable) is part of the file for the town hall’s responsible declaration or activity licence.
When to call an electrician
Call before signing the lease on the premises or starting the refurbishment: knowing whether you need a project avoids surprises in time and money. In Seville, Spain, we prepare the electrical design report and project, handle the business opening licence paperwork and carry out the work for shops and offices.
Related services
Design report and project
We prepare your electrical project in Seville, Spain when the installation requires one, and the technical design report (memoria técnica de diseño, MTD) when that is enough: shops, warehouses, EV chargers, solar panels and homes. We tell you which document you need before you buy any equipment, and we file it with the Junta de Andalucía, the regional government.
Opening licence
Opening licence electrics in Seville, Spain: to legalise business premises the electrical installation must be compliant and documented, with a registered installation certificate (the boletín), a technical design report or project and, if the premises receive the public, an inspection by an authorised control body (OCA). We check your premises, upgrade them if needed and hand you the electrical documents for the responsible declaration or the licence.
Shops and offices
An electrical contractor in Seville, Spain for shops and offices: fuse board, lighting, sockets, air conditioning lines, emergency lighting and boletín, with the electrical documents the opening licence requires. For shops, offices, clinics, academies and franchises, including international companies setting up in the city.
Need an electrician in Seville, Spain?
Call us or send a WhatsApp message with a photo of the job. You get a fixed quote before any work starts.