Glossary
Smart meter (contador inteligente)
Digital meter with remote management that measures your consumption hour by hour, sends readings remotely, enables time-of-use pricing and includes the power control function that the ICP used to perform.

What the smart meter is
It is the meter that replaced the old spinning-disc meters. It is normally owned by the distributor, which in Seville is e-distribución, and sits in the building’s meter room or a cabinet on the façade. It communicates with the distributor through the power network itself, so nobody has to come and read it.
What it measures and does
- Hourly consumption. It records the kWh of each hour, so the different tariff periods can be billed.
- Remote reading. Bills use real readings, not estimates.
- Power control. It includes the ICP: it cuts out if you exceed your contracted power.
- Remote changes. The distributor can change your contracted power without replacing it, as long as your installation allows it.
How to read its display
Pressing its button cycles the display through several values: date and time, total and per-period accumulated energy, instantaneous power and contracted power. Codes vary by manufacturer, but accumulated kWh and power in kW are usually easy to spot.
The CUPS and your consumption curve
The CUPS is the 20-character code starting with ES that identifies your supply point. It is on your bill and you need it for any paperwork: new connection, switching supplier or raising power. With it you can register in your distributor’s customer area and download your hourly consumption curve. See increase contracted power in Seville, Spain.
Related services
New electricity connection
We manage your new electricity connection in Seville, Spain from start to finish: the boletín (electrical installation certificate) for the connection, the application to the distributor, energising the supply and, if needed, a new service connection. Whether you are moving into a new home or bringing back a supply that was cut off, we handle the paperwork and the coordination with e-distribución.
Increase contracted power
You need to increase your electricity power in Spain when the smart meter cuts everything off as soon as the air conditioning, the oven and the washing machine run together. We check what power your installation can take, upgrade the supply cable, main switch and fuse board if needed, and issue the boletín so the distributor approves the increase.
Need an electrician in Seville, Spain?
Call us or send a WhatsApp message with a photo of the job. You get a fixed quote before any work starts.